// Geige aus Domholz

Building a violin from the roof beams of the Frauenkirche in Munich, part 10

Before I start working on the top, I give it a final polish with a scraper.

 

 

Then the f-holes are marked out. This work requires a good eye. The f-holes should be symmetrical.

 

 

Decke-f-loecher-aufgezeichnet

 

Then holes are drilled, they also serve as orientation for the interior finishing.

 

Geigendecke-f-loch-mit-bohrungen

 

Here you can see the finishing of the ceiling. This works in the same way as for the floor. First, the holes are roughly cut out, then the work becomes finer and finer using planers and finally scraper blades.

 

Ausarbeitung-geigendecke

 

When the top is almost finished, I saw out the f-holes with a fretsaw and cut them with a carver.

 

Übersicht / Blog / Aktuelles

Nachrichten rund um mein Atelier

Leave a Comment

19 − 16 =