Then we continue with the floor…
As with the ceiling, the base surface is planed flat, the outline is drawn and sawn out.
Then cut off roughly and create an even edge thickness.
Then we continue with the floor…
As with the ceiling, the base surface is planed flat, the outline is drawn and sawn out.
Then cut off roughly and create an even edge thickness.
Nächster Beitrag: Bau einer Geige aus Dachbalken der Frauenkirche München, Teil 5
Vorheriger Beitrag: Beitrag über meine Werkstatt