// Geige aus Domholz

Building a violin from the roof beams of the Frauenkirche in Munich, part 9

The ceiling and floor are smoothed on the outside and the frame is ready. The next step is to finish the inside.

 

To do this, I clamp the floor in a finishing jig and roughly cut it out first.

 

Geige-Boden-grobe-Ausarbeitung

 

 

Then the various cambering planes are used again, as with the outer cambering.

 

Boden-innen-woelbungshobel

 

The fine surface finishing is done with scraper blades.

 

Boden-innen-fertig

 

Übersicht / Blog / Aktuelles

Nachrichten rund um mein Atelier